Phase 1 Photos
August 2021
July 2021
June 2021
October 2020
August 2020
Landscape Restoration | Parking Lot Restoration | Landscape Restoration Along Bike Path |
---|---|---|
Parking Lot Restoration | Parking Lot Restoration | Parking Lot Restoration |
Topsoil Placement over Detention Vault | Parking Lot Restoration | Curb Replacement in Highcrest School Parking Lot |
July 2020
Installing Storm Sewer Piping around Detention Vault | Spreading Topsoil over Detention Vault | Bike Path Restoration |
---|---|---|
Curb Replacement | Restored Road | Placing Final Layer of Asphalt |
Driveway Apron Restoration | Restoration Work | Water Main Relocation |
Road Restoration | Vault Installation Progress | Road Restoration |
Road Restoration | Road Restoration | Road Restoration |
Preparing Vault Base | Placing Topsoil on Top of Vault | Vault Progress - Almost 85% Complete |
Vault Installation Progress | Detention Vault Installation | Placing Topsoil |
Road Restoration | Road Restoration | Road Restoration |
Road Restoration | Road Restoration | Road Restoration |
Placement of filter fabric and topsoil over installed detention vault | Detention Vault Installation | Inside View of Detention Vault |
June 2020
Preparing storm sewer structures for road restoration | Road Restoration | Road Restoration |
---|---|---|
Backfilling Detention Vault | Detention Vault Installation | Detention Vault Installation |
Curb Replacement | Box Culvert Installation | Box Culvert Installation |
Backfilling Detention Vault | Excavation for Detention Vault | Backfilling Detention Vault |
Junction Chamber Installation | Restoration | Storm Sewer Installation |
Detention Vault Installation | Detention Vault Installation | Detention Vault Installation |
Detention Vault Installation | Detention Vault Installation | Detention Vault Installation |
Preparing Base for Detention Vault | Access Ramp | Excavation for Detention Vault |
Box Culvert Installation | Storm Sewer Installation | Storm Sewer Installation |
May 2020
Junction Chamber Installation | Junction Chamber Installation | Storm Sewer Piping |
---|---|---|
Detention Vault Excavation | Storm Sewer and Box Culvert Installation | Topsoil Stripping |
Storm Sewer Installation | Storm Sewer Installation | Storm Sewer Installation |
Work Zone Fence Truck Gate | Concrete Barricades in Highcrest School Parking Lot | Rain Delay |
Storm Sewer Installation | Storm Sewer Installation | Manhole Waiting for Installation |
Full Access Driveway | Stripping of Topsoil | Full Access Driveway Construction |
Full Access Driveway Construction | Storm Sewer Installation | Water Main Installation |
Excavation | Stockpiled Soil |
April 2020
Security Camera and Lighting Fixture | Stockpiled Topsoil | Protective Tree Fencing |
---|---|---|
Construction Access Route | Construction Access Route | Construction Access Route |
Construction Fencing Installation | Construction Fencing Installation | Construction Fencing Installation |
Village of Wilmette
Neighborhood Storage Project